In response to a greater focus on [[Disaster Recovery and Business Continuity]] and the prolonged power outage in 2008 a 50KW Natural gas stand-by generator was installed in 2009 adjacent to the [[Data Center]]<ref>[[File:generator.pdf]]</ref>
In response to a greater focus on [[Business Continuity and Disaster Recovery]] and the prolonged power outage in 2008 a 50KW Natural gas stand-by generator was installed in 2009 adjacent to the [[Data Center]]<ref>[[File:generator.pdf]]</ref>


In the event of a power outage the generator will take-over from the UPS's and continue to power the servers and cool the Data Center until power is installed.
In the event of a power outage the generator will take-over from the UPS's and continue to power the servers and cool the Data Center until power is installed.
Line 9: Line 9:


===References===
===References===
Timeline: [[news date::2009]]
<references/>
<references/>


Line 14: Line 15:
[[category:WNA]]
[[category:WNA]]
[[category:2009]]
[[category:2009]]
[[category:Datacenter]]
[[category:Data Center]]

Latest revision as of 07:23, 3 May 2012

In response to a greater focus on Business Continuity and Disaster Recovery and the prolonged power outage in 2008 a 50KW Natural gas stand-by generator was installed in 2009 adjacent to the Data Center[1]

In the event of a power outage the generator will take-over from the UPS's and continue to power the servers and cool the Data Center until power is installed.


Date of Services

  • 3/24/2011

References

Timeline: 2009